深夜动态福利gif动态进出_韩国三级2021最新三级_孕妇大肚子还要疯狂几下_日韩中文字幕无码一区二区三区

Today:
首頁(yè) > English > News Gallery > Company Everts > Company News

MBEC Wins the Bid of Xuefu Bridge Project

Source:    Date:2012-07-20  

Recently, MBEC won the bid of Xuefu Bridge. The accepted contract amount is 217.5 million RMB and construction period 458 days.


Total length of this project is 1863.064m, including 758.397m long bridge and 1104.649m road . The total length of north auxiliary road is 465.75m and that of the south auxiliary road 433.853m. The width of standard cross-section of Taihu Avenue is 58m, the width of the bridge is 52m and the standard cross-section of auxiliary road is 10.5m.

up:

next: